Steel is sourced from qualified suppliers and undergoes inspection before acceptance into storage, ensuring project safety.
●
Precautions are taken during transportation, storage, and use of steel to prevent damage and contamination, thereby maintaining material performance and quality.
Ensuring Project Safety through Raw Material Quality Control
●
Maintenance plans are developed based on equipment performance, with tracking and evaluationprocedures in place.
●
Regular equipment inspections are conducted to identify issues, ensure timely repairs, and prevent safety incidents.
●
When aging equipment can't meet production demands, we implement replacement plans to mitigate safety risks.
Regular Inspection and Maintenance of Equipment for Safe Production
●
The company holds Grade I qualification for professional steel structure contracting. We have established robust project management systems, safe construction practices, and standardized operations.
●
Each project is supported by a dedicated project management team to oversee construction progress, ensure quality, and maintain safety and environmental standards.
Grade I Professional Steel Contracting
●
Everest Steels is actively advancing with intelligent production lines including H-shaped steel parts, box parts, and PKG integrated molding, enhancing production efficiency and product quality while minimizing safety incidents.
●
Our intelligent manufacturing equipment monitors real-time production safety hazards, enabling timely alerts and responses.
●
Equipment such as Laser Cutting, Robot Welding, Sawing, Drilling, Hydraulic Press, and Punching machines facilitate scalable and efficient factory production.
Advanced Manufacturing Equipment for Enhanced Efficiency and Safety
Service Support
Using Tekla Models to Ensure Accurate Dimensions and Prevent Missing Components
Class A Design Certificate
System Planning with Quality Manuals and Procedure Documents
We adhere to GB8923-88 specifications for steel surface rust and derusting grades before painting.
●
Our painting process complies with green environmental standards. We operate a fully sealed, environmentally friendly spray room and actively promote the use of water-based and solvent-free paints.
●
Qualified steel structural parts are packaged appropriately and labeled with project names, component numbers, and quantities to facilitate seamless site installation coordination.